National Electric Gate Testing Links are utilized for applications to any
two post terminal where open or closed circuit tests are needed. |
|
The Central Insulated Test Link and Insulated Test Terminals allows open and closed circuit tests to be made without disturbing connections on
|
|
either side of the circuit and also provides a convenient means to open and close a circuit for test purposes. |